Installation guide LoRaWAN
  • Installation help guide
  • About LoRaWAN
  • Installation steps
  • Information concerning the sensors
  • Installation
    • Sensors' provisioning
    • Activation of sensors
    • Configuration of downlinks
    • Validation of data reception
    • Installation of sensors
    • Payload decoding
  • 📂Appendices
    • 📎Applicability
    • 📎Safety
    • 📎Labels
    • 📎Communication mode
    • 📎Validation of LED behavior
    • 📎CO2 sensor calibration
    • 📎Wiring to meters
      • 📎TX PULSE
      • 📎TX PULSE LED
    • 📎4/20mA probe wiring
    • 📎Autonomy of batteries
    • 📎Battery replacement
    • 📎CE declaration
    • 📎Contact
Powered by GitBook
On this page

Was this helpful?

Export as PDF
  1. Installation

Activation of sensors

Power the sensors so they pair with the LoRaWAN network.

PreviousSensors' provisioningNextConfiguration of downlinks

Last updated 6 months ago

Was this helpful?


Once the transmitters have been declared using the keys on the cloud or the gateway, the LoRaWAN transmitters must be powered up to dialogue with the network.

Verify that the transmitters are in LoRaWAN mode. Validate that the jumper of each transmitter is correctly positioned on a single pin and that it is in LoRaWAN mode (see ). If this is not the case, please position the jumper correctly before proceeding with product activation.

Step 1 : Open the sensor housing

Open the boxes of the sensors that you have just declared and that you wish to activate.

Step 2 : Power the sensors

Power the first transmitter (of your choice) by connecting the Molex connector.

Step 3 : Validate the sensor LED behavior

The behavior of sensor LEDs is described in the

appendix
appendix